12-1-11
To: Parron Hall
7700 Ronson Road, Suite 100
San Diego, CA 92111-1514
Attention: Michelle Kyne
Reference: BEQ Building 26 Remodel Phase 2
Naval Medical Center, San Diego, CA
Dear Ms. Kyne,
Soltek Pacific would like to recognize how well Parron Hall managed the DIRTT wall project at Naval Medical Center San Diego, BEQ Building 26 Phase 2. It was a pleasure working with you and your team on this project. From the Design stage, all the way through to the completed install and punch list, you and your staff handled the project professionally and efficiently. There were many obstacles to overcome with multiple user group/customer requests and the Design Build process, including two phases of walls tying into one another. There were multiple measure visits made by your team to ensure the fit of the walls below a very tight ceiling space, which contributed to a nearly flawless install. In addition the DIRTT team did a exceptional job coordinating with the FFE team from Parron Hall during the design phase, as well as during the design phase, as well as during the install phase so the furniture install could proceed during the wall completion to avoid any delays in the project.
Our Project team would like to thank you for the job well done and hope to work with you again in the future.
Kevin Steiner
Project Superintendent
ksteiner@soltekpacific.com
